Difference between revisions of "Palette"

From GreenVulcano Wiki
Jump to: navigation, search
(Replaced content with " You can choose the types of operations")
Line 1: Line 1:
−
==Start==
 
  
−
Add img Nodo start
 
−
 
−
Represents the node of a flow started.
 
−
 
−
==Check==
 
−
 
−
Add img Nodo Check
 
−
 
−
Is the node where {{GVESB}} makes decisions and determines what the next node to execute. Each Check node has a basic routing mechanism that chooses the next node only of the presence or absence of errors indicated by exceptions.
 
−
 
−
==Wait==
 
−
 
−
inserire img
 
−
 
−
Allows you to insert delays in the execution of a stream.
 
−
 
−
==Notification==
 
−
 
−
inserire IMG
 
−
 
−
It allows a notification to signal on the process flow.For each 'NotificationNode' is associated with a list of notifications (Notification) that handle the type of message to send and the medium on which to write the notification.
 
−
ES: log4j, JMX
 
−
The order in which notifications are performed is the insertion order.
 
−
A notification can be described as 'critical', which is vital for the proper execution of the flow.
 
−
If a notification 'critical' throws an exception, the flow fails, and the exception is inserted into the buffer specified by the 'output' of NotificationNode.
 
−
The NotificationNode not read an input buffer, as may be specified a different one for each notification.
 
−
 
−
==ChangeGVBuffer==
 
−
 
−
inserire IMG.
 
−
 
−
It lets you make a change in the data buffer.
 
−
You can perform manipulations on the data buffer, set new properties or modify existing ones using scripting languages ​​such as JavaScript or OGNL.
 
−
 
−
==SavePoint==
 
−
 
−
inserire img
 
−
 
−
DB allows you to save the state of execution of the workflow. They can also be stored business information in the form of name-value pairs.
 
−
 
−
==End==
 
−
 
−
inserire img
 
−
 
−
End the flow execution.
 
  
 
You can choose the types of [[operations]]
 
You can choose the types of [[operations]]

Revision as of 09:48, 19 January 2012


You can choose the types of operations